Thanks to a big gift of one of our private donors the school was able to buy the old schoolground near by the school. This was the place where the school started between 2000 and 2005. The old wall, gate and two small houses will be pulled down and the ground will be leveled in order to make it ready for playing. The space in the schoolyard and rooftop terrace in the school itself is too small now for the growing number of students.
A new wall and gate will be build at the front side of the ground and three other walls to complete this. A bike shelter is also part of the plans, because the growing number of schoolbicycles give some problems in the narrow village streets.
In the end the ground will be adapted for playing sports and for physical training of the students.